dragon33 wrote:es/pip wrote:dragon33 wrote:I need some help!
Could someone please tell me how to get the period converter to work.
I don't remember how to use it.
open new chart of the pair you want
load period converter on it, select how much you want to change the value by
then--- file open chart offline, and go thru the list and find the one u want
Ok loaded on a new chart. Lets say i want a H6 chart what do i need to change. I can change the period multiplier but what's the number i need for the H6? Just done with my nightshift maybe that's the problem.
Can't get it to work
Hi Dragon
I think you need to load H1 chart,
then load period converter,
change multiplyer to 6,
go to file menu then open offline chart
H6 should be there.







